Dampier Wash Plant Life Extension

Closes in 10 daysSubmission deadline: 16 November 2026, 10:00 PM Australia/Perth

About this tender

Overview Rio Tinto Limited is seeking Expressions of Interest (EOI) for the Dampier Wash Plant Life Extension. This Scope of Work (SOW) is for EOI purposes only. A detailed scope of work will be issued as part of the project tender in 2027. About The DSL Dampier Wash Plant structure was commissioned in 2005. It is 20m high, steel framed, with suspended concrete slabs and process equipment (screens, centrifuges, classifiers, tanks, etc) used for salt process washing. Purpose The works are intended to extend the operational life of the asset by a further 15 to 25 years, bringing the total life of the structure to 40 to 50 years. Scope The DSL Dampier Wash Plant Life Extension will likely be a program of works over 5 years, inclusive of shutdown and online works. The scope includes: Scaffold construction Temporary works Concrete remediation, including breakout repairs and anodes installation Steel remediation, including compensation plating, blast, paint and member replacement (partial or full) Additional coating protection in challenging areas (Polibrid, Fuze, etc) Removal of process equipment Temporary adjustment of services (electrical and piping), including removal and replacement Conveyor and some mechanical interface works Annual Works The annual works are expected to include: As much online work as possible Shutdown works, with shuts 3 to 5 weeks long Dayshift and nightshift work A combination of concrete and steel remediation each year Instructions to Tenderers The works program structure is intended to be: Tender for all work package years during 2027 Evaluation of the tender and program opportunity during 2027 Stage Gate and award of 2028 works in Q4 2027 Each year of work is intended to include: A period of approximately 6 months for detailed work package planning, engineering, mobilisation and online works in advance of the shutdown A shutdown sometime during July to September Performance evaluation of works in Q4 Next year's package of work price review, confirmation, Stage Gate and award Works are expected to be annual until 2032, however this may vary to suit budget availability, and not all years will have a shutdown. Whilst a program of work is intended, this will be subject to procurement strategy review and tenders. The work packages for each year and scope are intended to be prioritised according to budget availability, structural capacity priorities and accessibility. The Company is considering Early Contractor Involvement options through the next study phase, Feasibility, and tender.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.