Overview Genusplus Group Ltd (WA) is seeking a suitable contractor to deliver substation civils, concrete foundations and cable trench works for the Parron Maan Marang Wind Farm 330kV HV Transmission Connection Terminal. Scope The scope includes: Excavation of cable trench Supply and install of cable pit with drains and cast-ins, connecting the cable pit to the existing drain line Supply and install of all conduits within the cable trench Grouting works Backfilling Supply and install of FRP trench cover and concrete cover Excavation, ground preparation, FRP and HD bolt installation for 388 concrete foundations Excavation and installation of conduits associated with concrete foundations and to the cable trench Blue metal, road seal, concrete kerbing and line marking (at a later stage) Fencing foundation and fencing installation MDR Instructions to Tenderers Specific scope requirements will be communicated to suitable contractors via an Invitation to Tender. Estimated start date on site: 03 December 2026 Estimated RFQ issue date: 24 August 2026 Estimated RFQ submission close: 14 September 2026
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.