Attunga and Monk Park Cricket Practice Net Works
Tender Overview
About this tender
Overview Tamworth Regional Council is seeking a contractor to undertake cricket practice net works at two sites: complete removal and reconstruction of the cricket practice net enclosure at Attunga, and replacement of damaged chain-link wire at the existing Monk Park cricket practice nets, Calala. Purpose The procurement combines two related packages of work: complete removal and reconstruction of the cricket practice net enclosure at Attunga, and replacement of damaged chain-link wire at the existing Monk Park cricket practice nets. Combining the works under one procurement provides a coordinated approach to contractor mobilisation, material supply, waste disposal, construction and project management. The proposed procurement combines two related cricket net projects that require specialist chain-wire fencing materials, installation methods and tensioning components. Engaging the same contractor for both sites provides the following benefits: Single point of accountability: one contractor is responsible for coordination, safety, materials, workmanship, waste disposal and completion across both locations Consistent construction standard: both facilities will use comparable galvanised chain-wire products and compatible fencing components Reduced coordination risk: combining the projects avoids separate mobilisation, contractor interfaces and differing installation methods Efficient delivery: the contractor can coordinate material ordering, travel, loading, waste disposal and construction scheduling across Attunga and Calala Clear defect responsibility: installation or workmanship issues can be directed to one contractor rather than divided between multiple suppliers Specialist capability: the works involve chain-wire tensioning, bracing and fastening methods requiring suitable fencing experience and equipment The Attunga project is a full reconstruction that includes replacement structural components and concrete works, while the Monk Park project retains the existing supporting structure and replaces the damaged chain-link wire. This distinction should be maintained in the purchase order and during completion inspections. Objectives The objectives of the procurement are to: Restore both facilities to safe and functional condition Replace deteriorated or damaged fencing components Provide durable outdoor sporting infrastructure suitable for community use Remove redundant materials and dispose of them appropriately Minimise disruption through coordinated scheduling Establish a single point of responsibility for workmanship, safety and completion Scope Site 1: Attunga Cricket Practice Nets The Attunga component involves removal of the existing cricket net structure and construction of a replacement chain-wire enclosure. There are currently two nets to be removed and replaced with one net. Removing the existing cricket net structure Loading, transporting and disposing of removed materials Preparing the cleared area for construction of the replacement enclosure Supplying and installing approximately 30 metres of Australian-made 3.15 mm galvanised chain wire Supplying and installing 40 nominal bore medium galvanised pipe for the top rails and vertical posts Supplying and installing plain wire for internal bracing Supplying and installing concrete for posts and structural supports Providing all labour, loading, travel, tools, plant and equipment required to complete the rebuild Removing construction waste and leaving the site clean, secure and ready for inspection Site 2: Monk Park Cricket Practice Nets, Calala The Monk Park component involves replacing damaged chain-link wire on the existing cricket practice net enclosure. Laying down and protecting the internal rubber matting before commencing removal works Removing the existing damaged chain-link wire Loading, transporting and disposing of the removed wire Supplying and installing approximately 40 metres of Australian-made 3.15 mm galvanised chain wire Supplying and installing plain wire for internal bracing Providing all labour, loading, travel, tools, plant and equipment required to complete the works Reinstating the internal rubber matting without damage following completion Removing loose wire, offcuts and construction waste Leaving the cricket practice nets clean, safe and ready for inspection and use Required Deliverables, Attunga A fully reconstructed cricket practice net enclosure Securely installed galvanised posts, top rails, bracing and chain wire Completed concrete footings and structural connections Removal and lawful disposal of the existing structure and construction waste A clean site free from loose wire, exposed fixings, sharp edges and other foreseeable hazards Required Deliverables, Monk Park Complete removal of the damaged chain-link wire Installation and appropriate tensioning of the replacement chain wire Secure installation of bracing, tie-wire clips and tensioning fittings Protection and reinstatement of the internal rubber matting Removal and lawful disposal of redundant wire and construction waste A clean site free from sharp wire ends, loose fixings and other foreseeable hazards Combined Completion Requirements For both sites, the contractor must: Inspect the completed work before handover Rectify any defective, loose or incomplete components Ensure wire ends and fixings are finished safely Confirm that the installations are stable and suitable for their intended use Notify Council when each site is ready for final inspection Contractor Requirements Conditions of Engagement Before commencing work, the contractor should be required to: Confirm final site measurements and quantities at both locations Verify the condition and suitability of the existing Monk Park supporting structure Confirm the proposed layout and construction methodology for Attunga Identify underground and overhead services before excavation or post installation Provide current public liability insurance, workers compensation coverage and any required licences or competencies Submit appropriate safe work documentation Establish site controls to prevent public access during construction Protect adjacent playing surfaces, rubber matting and Council assets Coordinate access and construction timing with Council's nominated representative Maintain both sites in a safe and secure condition throughout the works Obtain approval before undertaking any work outside the accepted scope Any defects identified in the existing Monk Park posts, rails or supporting structure that are not included in the quoted chain-wire replacement must be reported to Council before additional work is undertaken. Work Health and Safety The contractor must complete the works in accordance with applicable NSW work health and safety requirements, relevant manufacturer installation instructions and accepted fencing industry practices, with particular attention to: Isolation of the work areas from facility users Manual handling of chain-wire rolls, posts and other materials Control of sharp wire ends and metal offcuts Safe use of power tools and tensioning equipment Underground service identification before excavation Protection of the Monk Park rubber matting Secure storage of materials and equipment Removal of waste and loose fixings before reopening either site Contract Terms and Conditions Council's nominated representative should inspect each site independently before accepting the works. The completion inspection should confirm: The chain wire is correctly aligned, secured and tensioned Posts, rails, bracing and connections are stable Concrete footings at Attunga are complete and sufficiently cured There are no exposed sharp edges or unsecured wire ends The Monk Park rubber matting has been reinstated without damage All waste, surplus materials and temporary controls have been removed Each facility is safe and fit for its intended use Practical completion should not be granted until identified defects have been rectified.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 1 day05 November 2026, 02:00 PM Australia/Sydney
Cassilis Sewerage System - Treatment Plant
- Closes in 1 day06 November 2026, 12:00 PM Australia/Sydney
Randwick Barracks Building Refurbishment
- Closes in 2 days06 November 2026, 02:00 PM Australia/Sydney
Open Expression of Interest (EOI) - Fire Systems Maintenance Services
- Closes in 2 days06 November 2026, 05:00 PM Australia/Sydney
Gulargambone Swimming Pool Amenities
- Submission deadline: 09 November 2026
Internal Glazing - Sydney Metro West-Linewide
- Submission deadline: 09 November 2026, 03:00 PM Australia/Sydney
Structural Rectification and associated works - Granville - BH4JP
