Marrickville Golf Club Upgrade
Tender Overview
About this tender
Overview Inner West Council is seeking a contractor for the work under this Contract, encompassing all tasks necessary to achieve the project objectives outlined in the Contract Documents. This includes, but is not limited to, the refurbishment of the existing clubhouse and demolition and reconstruction of the proshop, workshop and amenities buildings located at Marrickville Golf Course, on Wharf Road, Marrickville, NSW. Scope The scope of works includes full demolition, new construction, associated landscape works, and essential services installations. The Work Under Contract (WUC) broadly comprises the following priority works: Site Establishment and Preparation Supply and install site fencing to establish a secure site compound, as per architectural drawings Remove and dispose of trees as documented, ensuring all other trees are retained and protected in accordance with Australian Standards and the Arborist's recommendations Demolition and Removal Demolish and dispose of the items in the clubhouse as documented in architectural drawings Demolish and dispose of the existing proshop, garage, workshop and amenities building, including all internal and external elements such as walls, floors, roofs, paths, bollards, fencing, services, fixtures, and fittings Demolish and dispose of existing footpaths/hardstands as highlighted in architectural drawings Earthworks and Structural Works Undertake excavation for new building works, including trenching for services and structural slabs/beams, as per consultant drawings, with an allowance for rock breaking based on the geotechnical report Construct floors, internal and external walls as per consultant drawings Install roofs and awnings, including associated footings, with a 10 day allowance in the program for an external plumber to install sanitary drainage between the clubhouse and proshop post demolition and levelling of the proshop area Civil and Services Infrastructure Complete all civil, stormwater, hydraulic, electrical, sewer connection, and underground works as per consultant specifications Install new sanitary drainage and connect to sewer pump out and grease arrestor post demolition of the proshop and surroundings Relocate the existing switchboard, opposite the tee off zone, to the rear side of the proshop once complete Re-connect lights and workshop power/conduit in the pit to the switchboard in its new location Relocate the existing meter on the temporary board for the workshop and lights back into the switchboard Connect power from the private pole to the proshop Install a new meter for the proshop into the switchboard Disconnect the temporary switchboard Building Fit-Out Prepare all walls and floors for waterproofing, tiling, epoxy flooring, and painting, ensuring all finished surfaces achieve compliant falls in line with the NCC and Australian Standards Install all new fixtures and fittings in accordance with architectural specifications Install soap and toilet paper dispensers supplied by Inner West Council Install new ceilings, windows, doors, door and window hardware, and signage Install electric strikes with integrated timers on all six public toilet doors, including ambulant and accessible WCs External Works and Landscaping Construct new external concrete pathways, graded in accordance with AS 1428 and with stormwater connections, as per consultant drawings Fabricate and install the external basin (prefabricated off-site), with shop drawings to be approved by the Contract Manager prior to manufacture Deliver the full scope of landscape works in accordance with the Landscape Architect's drawings and specifications Finalisation and Restoration Make good all areas impacted by construction, restoring the site to a satisfactory and safe condition Discretionary/Separable Portion New cart shed Landscaping (hard and soft) Internal floor coverings (carpet and cork) to internal areas of the club The WUC covered by this Contract includes the planning, management and supervision, ordering, supply and co-ordination of delivery of all materials (unless otherwise specified) and the cost of all labour, equipment, machinery, applications, testing, certificates, shop drawings, profits, overheads and making good as necessary to complete the works as detailed in the Contract Documents. Contract Terms and Conditions Site works commence: January 2027 Clubhouse alterations completed by: 15 September 2027 Proshop/Amenities new building completed by: 15 November 2027
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 1 day20 October 2026, 10:00 AM Australia/Sydney
Design and Construct Main Switchboard at Bathurst Wastewater Treatment Works
- Closes in 1 day20 October 2026, 12:00 PM Australia/Sydney
Nexus Electrical Supply Upgrade
- Closes in 1 day20 October 2026, 02:20 PM Australia/Melbourne
NATIONAL ELECTRICAL TENDER
- Closes in 2 days21 October 2026, 02:00 PM Australia/Sydney
Corowa Civic Centre - Council Chambers Refurbishment & Bowls Club
- Closes in 3 days22 October 2026, 10:00 AM Australia/Sydney
Darkes Town Centre Sporting and Community Hub Stage 1
- Submission deadline: 23 October 2026, 02:00 PM Australia/Sydney
Les Shore Reserve - Lighting Upgrade
