C30-11 - Power Generation - Jervois Copper Project

Open for submissionsSubmission deadline: 05 October 2026

About this tender

Overview KGL Resources Limited (NT) is seeking tenderers for the design, supply, installation, commissioning, ownership, operation and maintenance of power generation facilities for the Jervois Copper Project. Scope The scope includes: Design, supply, transport to site, installation and commissioning of the Project Power Station Operation and maintenance (O&M) of the Project Power Station Stage 1 diesel-fired power station Associated 11kV electrical distribution infrastructure Standby power generation facilities for the Accommodation Village and Mine Infrastructure Area (MIA) Stage 2 hybrid power station expansion The detailed Scope of Work is set out in the Power Generation Scope of Works, document number JER-C30-11-PWR-SOW-0002, Rev 0. Contract Terms and Conditions The power station facilities for both Stage 1 and Stage 2 are to be delivered under a Build-Own-Operate and Maintain (BOOM) commercial structure A Power Purchase Agreement (PPA) is required over a nominal 10 year mine life expectancy Information Requested For life-cycle cost evaluation purposes, tenderers are required to submit alternative proposals covering: A single-stage integrated development of a hybrid power solution Staggered development of Stage 1 and a subsequent Stage 2 development nominally 2 years later (subject to the contract, including notice to proceed terms) Enquiries Contact: Industry Capability Network (NT) Phone: +61 08 8922 9422

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.