Fuel Storage and Distribution - Nolans Project

ClosedClose date: 14 June 2026

Tender Overview

Reference616342
Issued byArafura Rare Earths Pty Ltd

About this tender

The SC660 Fuel Supply and Distribution scope includes provision of fuel storage, handling, and supply services to support construction activities at the Nolans Rare Earths Project. The Contractor shall supply, install, commission, operate, and maintain temporary fuel storage facilities and provide continuous diesel fuel supply throughout the construction phase. Key Inclusions: • Supply, transport, installation, commissioning, and maintenance of temporary self‑bunded fuel storage facilities including 2x 110kL tanks – located at the Process Plant and the Accommodation Village sites. • Provision and ongoing delivery of diesel fuel aligned with Project demand forecasts. • Supply, install, integrate and configure a smart fuel management system capable of managing fuel dispensation, user access control, recording transactions and generating consumption reports. The Works shall include, but not limited to, the provision of all materials, labour, PPE, tools and machinery, construction work, inspection and testing and temporary facilities required for the execution of the scope of works.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up