Open government and public tenders
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
The specialist reports have identified that the boilers, radiators and heating pipe infrastructure are at the end of life and due for replacement. It is proposed to replace heating with electric heat pumps to all spaces. An upgrade of the electric infrastructure will be carried out in accordance with the engineer’s design and recommendations including for control modules for the electrical load management. The removal of the boilers is to be included along with all redundant heating pipe both from within the boiler room and under floors of the classroom blocks. Asbestos has been identified in the boiler room linings and gaskets, underfloor where old pipe insulation has been left and in the vinyl flooring through which heating pipes penetrate. The safe removal of asbestos is to be included for within this project. The work will be sequenced so as not to leave the school at risk of not having heating as per the following suggested order of work: Electrical infrastructure works Supply and installation of heat pumps, commissioning of new systems Decommission and removal of the boilers and redundant heaters and radiators Safe removal of asbestos linings in boiler room Fitting of new linings and make good of walls Relocation of the main switchboard into the boiler room Removal of underfloor asbestos and redundant heating pipes Contact: Lee Ashby 04 233 0465
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.