Open government and public tenders
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Brisbane 2032 invites qualified subcontractors and suppliers to submit an Expression of Interest (EOI) for the scope outlined in the attached Scope of Works document. Scope: The services in this package cover the design, deployment, integration, and Gamestime support of in-venue Network Infrastructure equipment and associated services required across Brisbane 2032 venues. Network Infrastructure is a foundational layer supporting all Technology services, including Results, Timing & Scoring, Broadcast, Media Operations, Workforce Communications, and Venue Management. The NEP Partner will be responsible for delivering resilient, scalable, and secure venue-based network capability, aligned with the operational demands of a global major event and supporting 24/7 Games-time operations. A successful company has the opportunity to supply and be named the Network Equipment Provider (NEP) Partner, with this category open for a domestic sponsorship. Typically, this category includes a strong sponsorship offer (VIK / Cash) with Brisbane 2032 having a high expectation of securing a NEP Partner from this process. Those Suppliers with the capability, capacity, financial ability and an interest in becoming the NEP Partner are strongly encouraged to submit a Full Scope registration. Core Network Infrastructure The Partner will be responsible for delivering comprehensive in-venue network capability, including: • Switching and routing infrastructure within venues • Local Area Network (LAN) design and deployment across Technology Equipment Rooms (TERs) and network racks • Development and maintenance of Low Level Designs (LLDs) for all in-venue network infrastructure, aligned to agreed High Level Designs and venue requirements • Network infrastructure within venues to enable connectivity to external telecommunications services (provided by others) Wired & Wireless Services The solution must enable: • Large-scale wired connectivity for operational areas, media, OBS, timing/scoring, and Games systems • Pervasive Wi-Fi throughout indoor and outdoor spaces, including highdensity zones (press, broadcast, workforce, operations) • High-density Wi-Fi design and optimisation to support peak operational demand scenarios • Coordination with venue infrastructure providers for structured cabling (copper and fibre), including design standards and integration requirements Network Operations, Monitoring & Management The Partner must provide: • Network monitoring tools, dashboards, and alerting capabilities for in-venue infrastructure • Remote management capabilities for configuration, performance tuning, and fault diagnosis of network equipment • Integration of network monitoring and management tools and resources within the Technology Operations Centre (TOC) for Games-time visibility and coordination • support for automation and analytics to enhance network performance, visibility, and operational efficiency Cybersecurity & Access Control All network infrastructure must support the Games’ cyber security framework, including: • Network segmentation across stakeholder groups • Support for secure authentication, device control, and traffic protection mechanisms • Alignment with centralised cyber security services and IOC/IPC cyber protocols (as defined by the Cyber function) Venue Integration & Readiness Network infrastructure must be planned, coordinated, and deployed as part of overall venue readiness activities, including: • Equipment installation within TERs and venue technology spaces • Integration with venue-specific technology systems and operational requirements • Coordination with OBS, AV, Sport, Timing & Scoring, and Venue Management • Participation in pre-Games testing, readiness exercises, and validation activities Technical Support & Games-time Operations The Partner must provide: • On-site and remote technical support for network equipment throughout testing and Games time • Incident support, hardware replacement capability, and escalation support for network infrastructure • Support for configuration changes, performance optimisation, and continuity of in-venue network services • Collaboration with the Technology Operations Centre (TOC) and other service providers to support Games-time operations Sustainability & Reuse Solutions should reflect sustainable Games principles: • Use of energy efficient equipment. • Re-use or re-deployment options wherever feasible Solutions should reflect sustainable Games principles: • Use of energy efficient equipment • Re-use or re-deployment options wherever feasible • Minimisation of physical footprint and efficient installation approaches Indicative Requirements (Based on International Games Data) Historical Games provide insight into the likely scale of requirements for a project of this type. These figures are not targets, but help suppliers self-assess capability: Telecommunications & Infrastructure Volumes • Access switches: historically between 2,900 – 3,519 units. • Routers: Small form factor and core/distribution routers ranged from 66 – 150 units. • Firewalls: between 47 – 118 units deployed. • Load balancers: up to 55 deployed in prior Games. • Wi-Fi access points: ranged from 1,494 (Rio: BOH + Public) to ~9,960 (London + Rio combined BOH/Public). • Cabled network outlets: 65,000 – 94,776 total ports, with ~62,000 active. • TERs: Rio deployed 35 Telecommunications Equipment Rooms. • Network Equipment Racks (NERs): Rio deployed 879 racks, averaging 15.7 per venue. Representative Device Volumes & Network Demand Indicators • Personal Mobile Radios (PMR): 12,649 – 15,922 devices; 700 – 1,235 talk groups. • Mobile phones: 16,653 – 24,546 total devices. • Tablets: 384 – 411. These figures help suppliers gauge: • the scale of switching, routing, Wi-Fi and cabling required, • the operational complexity of deployments, and • the approximate volumes seen in large multi-venue events. All submissions must be lodged via the Gateway by ICN platform. Full scope EOI - Submit if you can deliver the full scope of works outlined in the scope of works document. Registrants' applications will be considered for shortlisting. Brisbane 2032 aims to invite 3-5 to tender. Partial scope EOI - Submit if you can deliver part of the scope only. Your business details will be shared with successful tenderers for subcontracting opportunities directly with them.
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.