Manufacture and Supply - Underground Switchrooms, MCCs and Field Panels - (Ref - ALP115-034a) - Carrapateena Expansion Stage 2 Project (CXPS2)

Open for submissionsSubmission deadline: 03 November 2026

About this tender

Overview BHP Group Ltd is seeking a contractor for the manufacture and supply of underground switchrooms, motor control centres (MCCs), and field panels for the Carrapateena Expansion Stage 2 Project (CXPS2), referenced ALP115-034a. Scope The scope includes design and supply of: Prefabricated electrical switchroom buildings that can be transported underground, including 7 high voltage switchrooms and 6 low voltage switchrooms Low voltage motor control centres Electrical and instrumentation field equipment, including local control stations, remote input/output panels, and communication cabinets Works include design, supply, manufacture, inspection, testing, quality control, quality assurance, protection, packaging, insurances, statutory compliance, certification, delivery, and acceptance testing. Enquiries Project Primary Contact Alex Vojdani, Supply Chain Manager: +61 04 4727 7175 Project Secondary Contact Eddie Ivar, ICN South Australia

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.