Cethana Power Station Switchyard Civil & Electrical Upgrade
Tender Overview
About this tender
Cethana Power Station comprises of an underground power hall, housing a single 100MVA Fuji unit with a Francis turbine. The machine is connected to three (3) single-phase power transformers, with a fourth disconnected spare installed as a contingency measure. The four underground transformers then connect to an above-ground 220kV switchyard via four oil-filled cables. This project seeks to replace the transformers, the oil-filled cables, and refurbish the switchyard, replacing most of the devices and infrastructure. This document defines the technical requirements for decommissioning, installation and commissioning of various electrical components. This has been broken into Primary Electrical equipment, Secondary Electrical equipment and Civil Works. Importantly, the supply, decommissioning, installation and commissioning of the four transformers and the 220kV EHV cable is completed by others. As such, no consideration is provided in this scoping document. Staging of works is to be considered, with Hydro Tasmania to work with contractors to minimise outage durations.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.