Onshore substation electrical equipment - Blue Mackerel Offshore Wind Project
Tender Overview
About this tender
Overview Blue Mackerel North Pty Ltd is seeking suppliers for onshore substation electrical equipment for the Blue Mackerel Offshore Wind Project in Gippsland, Victoria, covering supply and installation of key electrical plant, connection to the grid, and ongoing operations and maintenance support. Scope The scope includes: Supply and installation of STATCOM equipment Supply and installation of transformers Supply and installation of switchboards Connection to the grid Supply and installation of protection, security and control systems Design, testing, supply, delivery and commissioning of two 120-150MVAr STATCOM units (installation by others) Planned and corrective maintenance of installed plant, onshore and offshore HV switchgear and transformer servicing Oil and gas analysis Protection and control system testing Reactive plant servicing Secondary systems maintenance Earthing and lightning protection testing Condition monitoring Supply of strategic spares Ongoing support of control and monitoring systems across onshore and offshore assets, including SCADA, operational technology networks, telemetry and communications, and metering Associated cyber security services Contractor Requirements HV testing capability Commissioning capability Asset maintenance capability Industrial control system capability
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 3 days26 October 2026, 03:00 PM Australia/Melbourne
Kalora Park Reserve Pavilion Mezzanine Fitout
- Submission deadline: 27 October 2026, 05:00 PM Australia/Melbourne
Homes VIC - Laundry
- Submission deadline: 27 October 2026, 05:00 PM Australia/Melbourne
Homes VIC - Reverse cycle air-conditioning
- Submission deadline: 29 October 2026, 02:00 PM Australia/Melbourne
Comprehensive Lift Maintenance
- Submission deadline: 30 October 2026, 02:00 PM Australia/Melbourne
Glenthompson and Cavendish Public Toilets- Design and Construct
- Submission deadline: 30 October 2026, 03:00 PM Australia/Melbourne
Gillies Street Accommodation Precinct