Organics Processing Facility at Dimboola Transfer Station
Tender Overview
About this tender
Overview Hindmarsh Shire Council is seeking experienced and suitably qualified contractors to design, supply, install, commission and operate an onsite organics processing solution (composting facility) at the Dimboola Transfer Station, Hindmarsh Shire, Victoria. Purpose The primary purpose of this project is to process source-separated Food Organics and Garden Organics (FOGO) and green waste received at the Dimboola Transfer Station into a high-quality, pasteurised compost product that meets or exceeds the requirements of EPA Victoria Publication 1588.2, the Processed Organics Determination, and AS 4454-2012 (Composts, soil conditioners and mulches). The compost is intended to be suitable for Council operations (for example parks, gardens, roadside revegetation), potential sale to the community or agricultural users, or other beneficial reuse. Scope The scope includes: Design, supply, installation, commissioning and operation of an onsite organics processing solution (composting facility) at the Dimboola Transfer Station Assisting Hindmarsh Shire Council with the process of acquiring the necessary Development Licence and subsequent Operating Licence for an organics processing facility from the Environment Protection Authority Victoria (EPA), in accordance with the Environment Protection Act 2017 and EPA Publication 1588.2 Provision of a per tonne rate for decontamination and processing of FOGO collected from Hindmarsh Shire and other partner councils Contractor Requirements Experience and suitable qualifications to design, supply, install, commission and operate an organics processing facility Solutions appropriate for a rural, off-grid site with no mains power or potable water supply, with innovative, low-energy, water-efficient or self-sufficient designs (for example solar-assisted, passive aeration, rainwater harvesting, leachate reuse) strongly encouraged Proposed solution must be scalable to accommodate future increases in organic waste volumes following the planned rollout of kerbside FOGO collection across urban areas of the Shire by mid-2027 Composting technology (open windrow, covered windrow, in-vessel, hybrid, or containerised systems) must demonstrably meet the risk management, pathogen reduction, odour, leachate, and environmental performance requirements of EPA Publication 1588.2 Contract Terms and Conditions A trial period of up to 12 months is envisaged before Council considers entering into a longer-term contract, typically 5 to 15 years
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 1 day05 November 2026, 02:00 PM Australia/Melbourne
Goulburn Valley Water - Shepparton Water Treatment Plant Flood Barrier Construction Works
- Closes in 1 day05 November 2026, 02:00 PM Australia/Melbourne
G.R. Bricker Reserve Stormwater Harvesting Project – Stage 1.B Irrigation Shed
- Closes in 1 day05 November 2026, 05:00 PM Australia/Melbourne
Condensing Boiler Replacement - Horsham Civic Centre
- Submission deadline: 09 November 2026, 12:00 PM Australia/Sydney
EOI - Supply of Direct Drive Chiller
- Submission deadline: 11 November 2026, 03:00 PM Australia/Melbourne
Equip and Commission Existing Curdievale Bore
- Submission deadline: 12 November 2026, 02:00 PM Australia/Melbourne
Heating, Ventilation and Air Conditioning Maintenance Services at DEECA Regional Sites
