Control Systems Integrator - P2000 Expansion Project
Tender Overview
About this tender
Overview Pilgangoora Operations Pty Ltd (WA) is seeking a Control Systems Integrator to supply and deliver a complete control systems package for the P2000 Expansion Project. Scope The scope includes: Supply of the Control Systems Integrator package complete, including all software design, PLC and SCADA development, vendor package integration, testing, commissioning support, and associated documentation for the P2000 Expansion Project Development of functional specifications for PLC and SCADA systems based on supplied control philosophies Software design, PLC and SCADA development using Rockwell ControlLogix and Ignition platforms, based on approved templates Integration of vendor packages into a central control room for monitoring FAT and SAT testing, including preparation of FAT/SAT procedures and supporting test documentation Provision of control system specifications, IO lists and as-built documentation to support ongoing site operations and maintenance
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
