EK-04 GROH Partial Refurbishment 15 Woollybutt Kununurra PLND

Closes in 7 daysSubmission deadline: 30 October 2026, 01:30 PM Australia/Perth

About this tender

Overview Lake Maintenance (Western Australia) Pty Ltd is requesting subcontractor quotes for a GROH partial refurbishment project at 15 Woollybutt, Kununurra, carried out on behalf of the Department of Housing and Works. Scope Full Internal Paint (Floor Area 120m2 Approx) Carpentry Remove all screws, hooks, nails and other redundant fixings Patch or replace any damaged internal walls ready for painting Patch or replace any damaged ceiling and cornice, including removal of redundant vents or fans Patch, fill or replace any damaged skirting and/or architraves Patch, fill or replace any damaged timber or metal internal or external door frames Replace or paint damaged or missing shelving edging in all rooms and cupboards Painting Repaint all internal rooms, including the storeroom Paint all new raw materials, previously painted or varnished surfaces, or similar materials consistent with existing painted or varnished finishes Paint internal walls, ceilings and cornice throughout Paint internal woodwork and window trims throughout the property Paint internal doors complete Paint internal timber or metal door frames complete, including architrave Paint skirting boards Paint internal of all cupboards and cupboard doors Internal Colour Scheme Walls: Hog Bristle Half Strength, Semi Gloss Acrylic Doors, Skirtings and Architraves: White, Full Gloss Enamel External Colour Scheme External doors and door frames: Monument, Semi Gloss Enamel External Paint Patch and fill doors, door frames and all architraves ready for painting Repaint all external doors and door frames Electrical Upgrade Supply and install LED oyster lights in all rooms, including bedrooms, bathroom, laundry, toilet, storeroom and kitchen Supply and install or replace fluorescent lighting in the dwelling with LED Replace all external lighting with LED fittings Supply and install two LED sensor lights, one to the front and one to the rear of the property, including isolating switches Replace all power points with double power points Replace all switches and relocate switches in architrave Supply and install ceiling fans throughout the house Replace all exhaust fans Supply and install a freestanding white 600mm kitchen rangehood (including power supply), ducted into the ceiling space, with the existing ceiling exhaust fan removed and made good Remove all redundant electrical fittings and make good Supply and install (replace) all smoke alarms throughout the property Passage, False Ceiling and Duct Removal Remove false ceiling in passage, including disposal Remove old duct work, including disposal Remediate ceiling space ready for new ceiling Supply and install new plasterboard ceiling and cornice to passage Patch old aircon vents ready for painting Supply and install LED lighting to new passage ceiling Supply and install smoke alarm to passage Blinds (Beige Tones Colour Scheme) Supply and install double roller blinds with block out and sheer behind, outside mount Block out blinds to be opaque, washable and closely woven, with a minimum fabric weight of 270g/sqm Remove old treatments, including disposal Blinds required for: Kitchen (1200 x 1000), Diner (1200 x 1550), Laundry (650 x 1000), Bedroom F/R (1800 x 1200), Bedroom F/M (1800 x 1200), Bedroom M (1200 x 1200), Lounge (1800 x 1550), Lounge (2100 x 600), Lounge (1200 x 1550) Cleaning Clean all internal freshly painted surfaces, including removal of grime, stains, cobwebs, dust and marks Remove all redundant materials and site rubbish Information Requested Review of the Scope of Works, with any inconsistencies, errors, incomplete information or clarifications raised before submitting the quote A formal quote on company letterhead, valid for 30 days A price breakdown per trade type, using the supplied 'MDT Price Breakdown' template An estimated Service Delivery Program (SDP) including mobilisation time and time to complete works If unable to provide a quote, a reply advising the reason: pricing, current capacity and workload, nature of works, or resources An indication of whether a progress payment arrangement is to be considered All ACM pricing identified separately per property, if applicable Contractor Requirements All subcontractors, their employees and contractors must complete onboarding inductions prior to commencing work on site Subcontractors must follow appropriate protocols when entering and leaving remote communities Progress payment terms must be recommended by the Head Contractor at the time of submitting quotes to the Principal, and must be agreed with the Principal prior to any works being awarded Works will only be deemed completed and paid after all scope requirements are submitted, including before and after photos, waterproofing photos and reports Instructions to Tenderers Quote submissions must reference all attached documentation provided with the request Submission of quotes should be made no later than 5:00 PM on Friday, 30/10/2026 The requirements set by the Department of Housing and Works must be followed and reflected in the quote submission Submissions deemed incomplete will be rejected Enquiries For any questions regarding this opportunity, contact PandF@lakemaint.com.au.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.