GF-05 Maintenance 3 Properties Leonora PLND
Tender Overview
About this tender
Overview Lake Maintenance (Western Australia) Pty Ltd is requesting subcontractor quotes for maintenance works across three properties in Leonora and Laverton, Western Australia, for the GF-05 Maintenance 3 Properties Leonora PLND project. Works must be completed in accordance with the Department of Housing and Works (DoHW) requirements and technical specifications. Scope The scope includes the following maintenance works: Painting Painting of all rooms (lounge, dining, kitchen, passage, bedrooms, bathroom, toilet, laundry, store room) Painting of external face of doors, including front and rear solid core doors Painting of walls to the front veranda Application of nominated colour schemes to fixtures (doors and frames, skirting, architraves, quads, timber window frames, balustrade, trough cabinets etc), ceilings, cornices and walls Flooring replacement: vinyl tiles (Cable Dune) and ceramic tiles (Homeland Ash) at 42 Hoover Street; vinyl tiles to match existing at 8 Gwalia Street Carpentry, Fencing and General Trades Replacement of timber steps with steel-framed treads to front and rear verandas Replacement of timber planks to rear veranda, resecuring existing balustrades and hand rails, and replacement of missing balustrade sections Removal and disposal of fencing sheets and green mesh surrounding the front veranda, replacement of front fence (1.8m high) and personal gate, replacement of double gates, replacement of damaged section of 1.8m Colorbond fence, and removal of bushes near the front veranda Replacement of damaged wall planking, securing loose planking, and resecuring loose metal fascia to carport Replacement of damaged sections of ceiling and cornice, ceiling vents, tomb up and re-grouting of ceilings, and patching of holes in walls and ceilings Replacement of external front door, door handle and lock with snib, replacement of doors, passage sets, privacy sets, linen doors and handles, replacement of fly door closers and door buffers, rehanging of doors, and replacement of wooden sliding door to passage Rewiring of barrier screens, replacement of sliding sash/window rollers, reglazing of windows, replacement of curtain hooks, and supply and installation of Crimsafe security screens and security doors with barrier Replacement of vinyl floor tiles, wall tiles, ceramic skirting tiles, floor tiles and drain grates, and patching of vinyl tiles to match existing Supply and installation of 9mm HIR grooved Easycraft wall lining with dado at 900mm high, replacement of damaged wall sections with sealed wall sheeting, and replacement of skirting board Rebuilding of air conditioner hutch and replacement of air conditioner hatch panel and latch Kitchen works: removal of existing cabinetry, replacement of bench cupboard (including benchtop, pantry cupboard, drawer set and cutlery tray), overhead cupboards and kickboards, rehanging of bi-fold cupboard doors, replacement of melamine edge strips, replacement of splashback and broken wall tiles, and supply and installation of silicone fixture joints Bathroom works: supply and installation of new tiled shower recess and shower floor area (including waterproof membrane and soap holder), replacement of shower screen, vanity cupboard on legs (900mm), vanity splashback tiles, bathroom floor and skirting tiles, bathtub surround tiles, door and privacy set, mirror, towel rails and water damaged bottom section of door frames, and reglazing of windows with obscured glass Replacement of shelves to linen press, re-keying of store room door lock, replacement of door handle, patching of eave hole, resecuring of door frames, and removal and disposal of poisons cabinet Plumbing, Drainage and Gas Replacement of shower rose, shower floor drain, bathroom floor drain, bathtub, vanity basin, waste pipe and trap, supply and installation of flick mixers (shower, vanity, bathtub), and clearing of all blockages Kitchen works: disconnection of fixtures, supply and installation of sink bowl, replacement of sink trap and waste pipe, and supply and installation of flick mixer Replacement of laundry trough and sink, trough taps/flanges/spindles, and washing machine taps Toilet works: replacement of pedestal pan, cistern, flexi lead and wall tap, toilet seat, toilet roll holder, puddle flange and grate Replacement of gas bayonet and rear yard tap Major service of hot water unit Electrical Replacement of ceiling fans, exhaust fans, double power points (one with USB port), light switches, smoke alarms, light batten and fluorescent lights, and replacement of TV point and aerial Replacement/servicing of electric upright stove, supply and installation of electrical wall oven and electric top plate, upgrade of RCD to accommodate wall oven and top plate, and disconnection and reconnection of power in kitchen Replacement of external prismatic lights and bunker lights (front, carport, veranda, laundry) Supply and installation of heat light (2 globes plus 1 standard light) and heat pump with required RCD upgrades and power point, and replacement of power point for air conditioning Disconnection and disposal of disused second smoke alarm Re-stringing of rotary clothesline / replacement of wires to clothesline Completion Heavy clean of all rooms including front and rear verandas (42 Hoover Street) and heavy clean of oven/stove (8 Gwalia Street) Medium clean of the asset upon completion High pressure clean of external cladding (8 Gwalia Street) Strip and polish of vinyl floors Mowing/slashing, raking, removal of sharps and rubbish, and levelling of grounds in all yards, and removal of rubbish from under the house (42 Hoover Street) Replacement of rotary clothesline and servicing of hot water system to be in good working order (5 Ida Place) Contractor Requirements Minimum Public Liability Insurance of AUD 20 million Minimum Workers Compensation Insurance of AUD 20 million All subcontractors, employees and contractors must complete onboarding inductions prior to commencing work on site Subcontractors must follow the appropriate protocols when entering and leaving remote communities Compliance with the Department of Housing and Works (DoHW) requirements as reflected in the quote and supporting documents Information Requested Submissions must include: Completed Subcontractor Evaluation Questionnaire Quote clearly showing price, excluding GST Quote valid for 30 days Lead time (in weeks) to mobilise and time (in weeks) to complete all works in accordance with the Scope of Works, including any holiday closure period Price breakdown using the supplied MDT RFQ price breakdown template Safety Management Plan Evidence of Public Liability Insurance (minimum AUD 20 million) Evidence of Workers Compensation Insurance (minimum AUD 20 million) Indication of whether a progress payment arrangement is to be considered Subcontractors unable to submit a quote should reply advising the reason, selecting from: pricing, current capacity and workload, nature of works, or resources. Contract Terms and Conditions Progress payment terms must be recommended by the Head Contractor at the time of submitting quotes to the Principal, and must be agreed with the Principal prior to any works being awarded Works will only be deemed completed and paid once all scope requirements are submitted, including before and after photos, waterproofing photos and reports
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
