Pfeiffer Road Reconstruction (SLK 16.8-19.9 & SLK 25.9-27.8)
Tender Overview
About this tender
Overview The City of Albany is seeking a contractor to undertake the reconstruction of Pfeiffer Road between SLK 16.8-19.9 and SLK 25.9-27.8, comprising earthworks, road works and drainage. Scope The work involves full width pavement reconstruction, pavement overlay, rehabilitation and shape correction of the existing pavement, plus widening of the existing road to an 8.5m formation with a 7.0m wide primer seal plus 0.75m wide shoulders. Allowance should be made for the replacement of unsuitable material in the shoulders and table drains. The scope includes: Vegetation clearing and grubbing and removal of all roots and detritus Earthworks including cut to fill, cut to spoil, embankment foundation preparation and embankment construction Earthworks benching, compaction and trim of fill batters Full width pavement reconstruction (including installation of geofabric and geogrid) as shown on the drawings Partial pavement reconstruction as shown on the drawings, including construction of subgrade where required Supply and installation of drainage culverts and headwalls, and cutting of side drains, including trimming and grading to the dimensions and levels described in the drawings Blending into existing carriageway and existing drains Driveway crossover reconstruction and sealing Bituminous surfacing consisting of a Primer Seal only, plus some areas of scatter coat (a Second Coat Seal is to be applied in the future by others and does not form part of this contract) Supply and installation or relocation of signs and guideposts Contractor Requirements A minimum of one lane must remain open to traffic at all times during the works Gravel is available at no cost from a City-owned pit at Pfeiffer Road and Lake Warburton Road, with approximately 15,900m³ compacted required, which the contractor must crush Contract Terms and Conditions Contract form: AS4000 Practical completion for Separable Portion 1: 12 weeks from commencement Practical completion for Separable Portion 2: 10 weeks from commencement Instructions to Tenderers The City reserves the right to award each portion separately as individual contracts, as a whole, or not at all.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 2 days16 November 2026, 10:00 AM Australia/Perth
AGRN1185 TC Zelia – Road Repairs in Southern & Eastern Areas (East Pilbara)
- Closes in 2 days16 November 2026, 12:00 PM Australia/Perth
RRG Funded Road Projects
- Closes in 3 days17 November 2026, 02:00 PM Australia/Perth
Doddis Beach Protection Stage - 1 Construction Works
- Closes in 3 days17 November 2026, 02:30 PM Australia/Perth
Department of Education - Bambara Primary School - Full-Time Kindy Program Bike Track and Accessibility Ramp
- Submission deadline: 18 November 2026, 03:00 PM Australia/Perth
Blackspot Program – Intersection Upgrades
- Submission deadline: 19 November 2026, 02:30 PM Australia/Perth
Demolition of Lot 18, 2 MacDonald Way, Fitzroy Crossing, WA, 6765