Open government and public tenders
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Find open Australian and New Zealand tenders by state, then write a winning response with Scryve.
Scope: Nominally 60 days of offshore construction activities (incl. mobsand transits) consisting of: • Provision of fully manned vessel including marine,construction, & ROV crews. • Installation and recovery of pipelay initiation anchor/s(15T Stevshark), Water Depth ~1300m • Installation and recovery of dia. 52mm / 2.5km Start upwire for pipeline initiation • ROV monitoring and support of Solitaire pipelay activities • Pipeline pre commissioning activities (procedures and equipment provided by Charterer) • As-built survey services. • Australian Safety Case not required Minimum Requirements: • Bollard Pull >150Te • 2x WROVs • Cargo deck area 400m2 • Towing drum capacity to accommodate 2500m of 50mm wire. • Helideck (Optional) Contact: All initial enquiries should be made through the Industry Capability Network Western Australia Hengameh Kiani Email: h.kiani@icnwa.org.au Dial: (08) 9365 7543
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.