Health NZ ROI - Whakatane Hospital Domestic Hot Water Replacement - Design & Build Services
Tender Overview
About this tender
Overview Health NZ invites Registrations of Interest from the open market for Design and Build services for the Domestic Hot Water (DHW) Pipe Replacement Project at Whakatāne Hospital. Purpose The existing DHW reticulation system has been identified as a critical plumbing infrastructure risk across the district hospital, requiring remediation to maintain service continuity and compliance with Building Warrant of Fitness requirements. The current DHW pipework has experienced recurring failures, resulting in reactive maintenance, local outages to critical assets, and disruption to clinical services. The project aims to deliver a reliable, maintainable, and resilient hot water system that supports continuous hospital operations in a live acute healthcare environment. Scope The scope includes: Design and build services for the Domestic Hot Water Pipe Replacement Project at Whakatāne Hospital Staged replacement of the existing DHW reticulation system Enquiries Contact: Jonathan Bird Email: jonathan.bird1@tewhatuora.govt.nz Phone: 0211950617
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
