ROI for a Main Contractor for a new Hall for Chelsea Primary School
Tender Overview
About this tender
The School is planning to undertake these works. This procurement seeks to engage Main Contractor Services for the construction of a new hall/multipurpose building (the Contract Works) for The Board of Trustees (BoT) (The Principal) at Chelsea Primary School (the School). The school is located on the corner of Onetaunga & Balmain Road, Chatswood, Auckland. First opened in 1981, Chelsea Primary School is a co-educational state school catering to students from Years 1 through to 6. The former school hall (now demolished) had reached the end of its serviceable life, and replacement of the building in the same location is required. As depicted in the concept drawings & specifications provided, the new building is currently intended, subject to finalising funding, to have an internal floor area of approximately 330m² and will comprise a hall, kitchen and pantry, storage, and ablution facilities. A timber deck, canopy, and connecting accessible ramp and paving will form the external works. Site Visits are NOT permitted during this ROI stage.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
