Boyne Smelter - Reduction Line 3 Change House Amenities Facility Construction

ClosedClose date: 11 July 2026

About this tender

Boyne Smelters Limited (BSL) seeks to identify suitably qualified and capable building contractors for an upcoming project, Reduction Line 3 Change House. The successful contractor shall be responsible for all civil, building, plumbing and electrical works in the construction of a new standalone amenities' facility within the BSL site. Please see the General Arrangement drawing package for reference of facility scale. The project is anticipated to be tendered in Q3 of 2026, with works to be completed within 2027. Further Notification This scope of work is a summary description of goods and/or services that may be required by Rio Tinto and may be subject to change in Rio Tinto’s absolute discretion. Your business capability statement, as stored on your portal profile, may be downloaded and referenced when the responses to the expression of interest are reviewed. It is recommended that Suppliers review the portal business details section to ensure all information, including contact email address, annual turnover and employee numbers, is current and accurate. As this is an Expression of Interest (EOI) only, the specifics of the package of work relating to breadth of scope, location and timing may be subject to change. If successful, the Supplier/s will be notified of any changes prior to award.

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up