MI187520- Lot 82 Kebisu Street, Iama (Bathroom Upgrade)
Tender Overview
About this tender
Overview Torres Strait Island Regional Council is seeking a contractor to undertake a bathroom upgrade to stud frame construction at Lot 82 Kebisu Street, Iama. The works relate to the upstairs bathroom only; the downstairs bathroom is excluded from these works. Nominal room measurements are 2800 x 2600mm with a ceiling height of 2670mm, per the Bathroom Plan. Scope The scope includes: Removal of all associated fittings as required Removal and disposal of existing floor coverings Removal and disposal of existing bathtub/shower tray, shower combination and tap ware Removal and disposal of existing FC wall and ceiling sheeting Inspection and reporting of any damage to the downstairs ceiling and sub floor arising from bathroom water ingress, with rectification works to be separately assessed Replacement of all damaged/rotten jambs, architraves and mouldings Supply and installation of new 6mm FC sheeting to walls and ceiling Wet sealing of the bathroom to Standards in accordance with AS 3740, including the entire floor area and floor wall junctions (minimum 200mm) and the bath tub and shower area (to a minimum height of 1800mm) Supply and installation of a new 1200mm corner bathtub/shower tray to match existing, complete with new stainless steel shower/bath combination, bath spout, shower rose and tap ware meeting a minimum 3-Star WELS Water Efficiency rating as per the Queensland Development Code (no copper in wall) Supply and installation of ceramic glazed wall tiles to wet areas of the bath/shower, vanity splashback and walls to match existing height Supply and installation of a horizontal grab-rail in the shower recess, 600mm in length or as existing (whichever is greater), with the top of the rail matching the existing layout and complying with AS 1428.1 (2001) clause 6.2 Supply and installation of new white Lamipanel to all walls and ceiling including new treated timber cornice, installed as per manufacturer's recommendations using no mechanical fixings Supply and installation of a new 900mm wide (or as existing, whichever is larger) Cartia waterproof wall mounted vanity cabinet kit complete with new stainless steel combination, single bowl ceramic top with overflow and tap ware meeting a minimum 3-Star WELS Water Efficiency rating as per the current Queensland Development Code, with doors, drawers and seen ends in high gloss white, soft closing with finger pull or chrome handle pull, a securely fixed carcass, and the ceramic top sealed onto the lamipanel/ceramic tiled splashback with a white/clear, mould resistant, acid (acetoxy) cure bathroom/kitchen silicone sealant; required products are the Cartia Australia Arlington or Coral vanity ranges, and if the factory Cartia vanity size does not fit the original space, a standard vanity unit is to be built and installed to match the opening Supply and installation of a new floor waste installed to manufacturer's requirements, ensuring a fall in the floor to help drain the surface, including any voluntarily included floor wastes Supply and installation of new 200 x 200mm tiles with an R10 slip rating when wet and an X pendulum rating to the floor, ensuring falls to waste, including tiled skirting of one tile high, complying with AS/NZS 4586 Supply and installation of two new towel rails (1200mm x 32mm SS grab rail), a soap dish and a mirrored shaving cabinet Supply and installation of a hospital style shower track sized to suit the shower area (nominal size 1200 x 1200mm), including ceiling support and hooks for the curtain, with a mildew resistant curtain with a weighted bottom Upgrade of all plumbing as required, including installation of a tempering valve if required Upgrade of all electrical to the bathroom to meet AS3000, including a new IP54 light fitting and double GPO Repainting of all areas including walls, existing door, window frames, and new and disturbed areas, with doors and trims in full gloss enamel and walls in full gloss acrylic, and all new doors primed and painted in their entirety Replacement of the existing toilet pan, cistern and seat to match existing, with the new pan sealed to flooring with a proprietary sealant, the cistern fixed to the wall as per manufacturer's details, and the suite meeting a minimum 3-Star WELS Water Efficiency rating as per the current Queensland Development Code, including a new securely fixed toilet roll holder (SS "Emro Toilet Roll Holder Cat. No. 810" or equal approved) Supply and installation of a grab-rail in the toilet to assist with toilet transfers, installed on a diagonal bias to match the existing layout and dimensions, complying with AS 1428.1 (2001) clause 6.2 Supply and installation of a new 250mm round, ceiling mounted exhaust fan, hardwired and independently switched Supply and installation of a new redicote honeycomb door complete with three 100mm hinges and associated new hardware and furniture, with the entire door primed and painted with an enamel paint system on completion to match existing surfaces Contractor Requirements Provide a certificate and manufacturer's warranty for the wet seal within two weeks of practical completion
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
Similar public opportunities
Review the lifecycle label on each related notice to see whether submissions are open.
- Closes in 3 days18 October 2026, 10:00 PM Australia/Brisbane
Underground Civil Construction (UCC)
- Submission deadline: 20 October 2026, 10:00 AM Australia/Brisbane
Battery Park Stage 2 (Pump Track)
- Submission deadline: 20 October 2026, 10:00 AM Australia/Brisbane
Battery Park Stages 1, 3, 4 and 5 civil construction
- Submission deadline: 20 October 2026
Expression of Interest (EOI) - Civil Infrastructure Works - Kings College, Wallon, QLD
- Submission deadline: 21 October 2026, 02:00 PM Australia/Brisbane
Design, Supply and Installation of Solar (Events Centre)
- Submission deadline: 23 October 2026, 02:00 PM Australia/Brisbane
CAIRNS HOSPITAL - C Block Switchboard - Building Works
