Overview Seqwater is undertaking a two-phase procurement process to identify and engage suitably qualified Principal Contractors for the delivery of office accommodation buildings at the Mt Crosby and North Pine Water Treatment Plant sites. This is a design and construct opportunity. Scope Progressing the office accommodation building projects from 60% design completion through to Practical Completion Instructions to Tenderers Phase 1: Expression of Interest (EOI) Through this EOI process, Seqwater is seeking to identify and shortlist Principal Contractors for participation in the subsequent Request for Tender (RFT) phase. Proponents may submit a response for either site or both sites, as outlined in the Statement of Requirements. Respondents will not be disadvantaged based on their selection of one or both sites. Phase 2: Request for Tender (RFT) The RFT will be issued to the shortlisted contractors identified through the EOI process. The RFT is anticipated to commence in mid-October 2026, with contract award expected in late March to early April 2027.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.