Campaspe Shire Council, Echuca HQ Lift Design and Construction
Tender Overview
About this tender
Overview Campaspe Shire Council invites suitably qualified and experienced contractors to tender for a new accessible lift system at the Shire Headquarters in Echuca. Scope The scope includes: Design of a complete external lift system serving Ground Floor and Level One of the Shire of Campaspe Headquarters building Engineering of the lift system Supply of the lift system Construction of a new external shaft structure to house the lift Installation of the lift system Testing of the completed lift system Commissioning of the completed lift system Certification of the completed lift system Incorporation of diagonal entry and exit points to align with existing circulation paths, both externally and internally Contractor Requirements Proven ability as a full Design and Construct contractor to undertake all aspects of the project Demonstrated experience delivering similar projects Information Requested Methodology Programme Design concept Site Inspection A compulsory site inspection will be conducted in accordance with the tender documents.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
