Inverleigh Recreation Reserve Sports Lighting - Oval 2
Tender Overview
About this tender
Golden Plains Shire Council is undertaking sports lighting works at Oval 2, Inverleigh Recreation Reserve in Victoria's Grampians region. The project involves an electrical contractor delivering supply, installation, and upgrade of sports field luminaires and poles, associated underground cabling and switchboard works. Works will include commissioning to relevant lighting standards such as AS 2560.2 and sport-specific lux levels, along with compliance and testing documentation.
Frequently asked questions
- Oval 2 at Inverleigh Recreation Reserve, located in the Grampians region of Victoria.
- Golden Plains Shire Council is undertaking this sports lighting project.
- The scope includes supply and installation or upgrade of sports field luminaires and poles, associated underground cabling and switchboard works, commissioning, and compliance and testing documentation.
- Works will be commissioned to relevant lighting standards including AS 2560.2 and sport-specific lux levels.
- An electrical contractor is required to deliver the sports lighting works.
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.
