Wet and Dry Plant SMPEI Construction Works - P2000 Expansion Project
Tender Overview
About this tender
Overview Pilgangoora Operations Pty Ltd is seeking a contractor to carry out the on-site execution of Wet and Dry Plant Structural, Mechanical, Piping, Electrical and Instrumentation (SMPE&I) Construction Works as part of the P2000 Expansion Project. Scope The scope of works is separated into two standalone packages: Wet Plant and Dry Plant. Wet Plant Package The Wet Plant package involves site construction works for a greenfield wet plant build. The scope includes: Installation of Principal-supplied pre-assembled steel modules (pipework and cable tray installed), approximately 5,500 tonnes of steel Installation of Principal-supplied mechanical equipment, including multiple pumps, Ball Mill, SAG Mill, WHIMS units, Flotation circuit, Tanks, Thickeners, Conveyors and Belt filters Installation of Principal-supplied loose piping Installation of Principal-supplied electrical items, including switch rooms, cables and instruments HV tie-in into the existing power station Stage 1 construction verification and completion (CVC) completion Dry Plant Package The Dry Plant package involves site construction works for a greenfield plant build, including but not limited to: Installation of Principal-supplied pre-assembled steel modules, including associated pipework and cable tray already installed within the modules, with an indicative steel quantity of approximately 9,000 tonnes Installation of Principal-supplied piping systems Installation of Principal-supplied mechanical equipment associated with primary crushing, oversize screening and crushing, ore sorting, rejects stacking and coarse ore stacking Installation of Principal-supplied electrical and instrumentation items, including HV and LV switchrooms, cables, instruments, process communications and associated field works HV tie-in works into the existing power station, including associated planning, testing and commissioning support Stage 1 construction verification and completion (CVC) support, including completion documentation and punch list activities
How to respond to this tender
A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.
Read the requirements in full
Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.
Confirm you are eligible and it is worth bidding
Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.
Answer every criterion with evidence
Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.
Lodge early through the official portal
Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.