GF-06 Maintenance Partial Refurb Kalgoorlie PLND

Closes in 4 daysSubmission deadline: 26 October 2026, 05:00 PM Australia/Perth

About this tender

Overview Lake Maintenance (Western Australia) Pty Ltd is requesting subcontractor quotes for the GF-06 Maintenance Partial Refurb Kalgoorlie project, covering maintenance and partial refurbishment works at four Kalgoorlie and Boulder properties, to be carried out in accordance with the Department of Housing and Works (DoHW) technical specifications and requirements. Scope The scope includes the following works across the properties listed in this notice: Painting Paint room complete (entry, lounge, dining, kitchen, passage, stairs, bedrooms, bathroom/laundry, toilet, store room) Paint external face of doors Apply nominated colour schemes: fixtures (doors and frames, skirting, architraves, quads, timber window frames, balustrade, trough cabinets etc) in White 100% Full Gloss Enamel; ceiling and cornice in White 100% Low Sheen Acrylic or Semi-Gloss Acrylic; walls in Lexicon Full (3/2 Britannia Place) Carpentry, Glazing and General Trades Replace or adjust doors, passage sets, privacy sets, locks, snib locks, door barrels, door buffers and handles Replace curtain hooks and window/sliding sash rollers Reglaze broken window panel Replace walls, wall sheeting, ceiling and cornice, ceiling insulation, skylight, skirting, and damaged cornice Patch holes in walls and ceilings; tomb up and re-grout ceilings Replace vinyl floor tiles, wall tiles, skirting tiles and splashback tiles Replace benchtop, vanity and cabinetry where nominated Supply and install new tiled shower recess and shower floor area, including waterproof membrane and soap holder Supply and install security screens, security doors and crimsafe/crim mesh screens fitted with stainless steel mesh Remove sliding robe door and dispose Re-hang rear personal gate, re-install doors and door frames Plumbing and Drainage Replace sinks, taps, flickmixers, waste pipes and traps Replace shower taps, shower roses, shower screens and shower curtain rails Supply and install puddle flange and grate to floor and shower recess Replace laundry trough, trough taps/spout, and washing machine taps Replace toilet pedestal pans, cisterns, seats and toilet roll holders Replace vanity basins, bathroom floor drain, and bath tap sets Reinstall bathtub and clear all blockages Replace missing downpipe and external grate cover; replace gutters to rear veranda and clean gutters, valleys and downpipes Electrical and Gas Replace external prismatic bulkhead lights with bunker lights Supply and install LED downlights Replace ceiling fans, exhaust fans, power points, light and fan switches, TV and phone points Replace smoke alarms and light battens Replace/renew fluorescent lights Supply and install heat pump, including all required electrical works and power point Reconnect existing upright electrical stove with anti-tilt bracket and chain Re-install gas stove, complete a minor service and replace missing burner External and Yards Remove old padlocks to gates and shade cloth to rear verandah Replace missing external drain grates Replace clothesline (rotary) Minor service of hot water unit Completion Medium clean asset upon completion and remove all sharps Heavy clean room for store room and shed, and remove any rubbish inside (3/2 Britannia Place) Strip and polish floors (vinyl and flooring to lounge, kitchen, dining, bedrooms, entry, passage) Mow/slash and rake yards, removing rubbish, broken glass and sharps Contractor Requirements Minimum AUD 20 million Public Liability Insurance Minimum AUD 20 million Workers Compensation Insurance All subcontractors, their employees and contractors must complete onboarding inductions prior to commencing work on site Subcontractors must follow the appropriate protocols when entering or leaving remote communities Information Requested Submissions must include: Completed Subcontractor Evaluation Questionnaire Quote clearly showing price, excluding GST Confirmation that the quote is valid for 30 days Lead time (in weeks) to mobilise and time (in weeks) to complete all works as per the Scope of Works, including any holiday closing period Price breakdown using the supplied MDT RFQ price breakdown template Safety Management Plan Current Public Liability Insurance certificate Current Workers Compensation Insurance certificate Instructions to Tenderers Refer to the details provided and the attached documents to ensure the quote is sufficient and covers the required works and technical specifications as per DoHW's requirements The requirements set by the Department of Housing and Works must be followed and reflected in the quote, with reference to all attached documents Any submission deemed incomplete will be rejected Subcontractors unable to provide a quote submission should reply to the request email briefly explaining the reason, selecting from: pricing, current capacity and workload, nature of works, or resources Submission of quotes should be made no later than 5:00 PM Thursday, 26/10/26 Indicate whether a progress payment arrangement is to be considered (yes or no); progress payment terms must be recommended by the Head Contractor at the time of submitting quotes to the Principal, and must be agreed with the Principal prior to any works being awarded Contract Terms and Conditions Works will only be deemed completed and paid after all scope requirements are submitted (for example, before and after photos, waterproofing photos, and reports) Enquiries For questions regarding this request for quote, contact PandF: PandF@lakemaint.com.au

How to respond to this tender

A strong tender response is clear, compliant, and backed by evidence. These steps apply to most Australian and New Zealand public tenders.

Read the requirements in full

Open the official listing and download the full tender pack. Note the response schedules, evaluation criteria, mandatory conditions, and the exact closing time and lodgement method.

Confirm you are eligible and it is worth bidding

Check licences, insurances, certifications, and any conformance requirements before you commit. A quick bid or no-bid decision saves days of wasted effort on a tender you cannot win.

Answer every criterion with evidence

Respond to each evaluation criterion directly and back your claims with concrete examples, referees, and past performance. Address the buyer’s stated need, not a generic capability statement.

Lodge early through the official portal

Submit through the source portal well before the deadline. Late or incorrectly lodged bids are almost always rejected, so leave time for uploads, portal errors, and last-minute questions.

Ready to write winning tenders?

Sign up today, what a relief.

Sign up

Similar public opportunities

Review the lifecycle label on each related notice to see whether submissions are open.